Category

NOVI PAZAR - TUTIN ROAD CONSTRUCTION

SERBIA INFRASTRUCTURE

Project Name: Novi Pazar - Detailed regulation plan for the reconstruction of Tutin Highway - design and preparation of technical documentation

Novi Pazar - Tutin Road Construction Km: 4 + 355,10 - Km: 24 + 889,56
Length of the road: 20534,16 meters
Road Width: 6.00 meters
Road Type: 1x2
Excavation: 113000 m3
InFilling: 45195 m3
Reinforced Concrete Works: 6700 m3
Ø 90 Bored Pile: 2068 meters
Wearing layer: 5348 tons
Construction of Bituminous treated base: 21053 tons
Base course 2988 m3
Sub-base layer: 38820 m3
Bridge:
6 + 700 Stream bridge 17.25 meters

  • ALL
  • PHOTOS
  • VIDEOS