TORBALI-ODEMIS-KIRAZ ROAD GRADING, SUPERSTRUCTURE AND HBM WORK

Torbali-Odemis-Kiraz Road km 52+450-79+350 Grading, Engineering Structures, Superstructure and HBM Works

2nd REGIONAL DIRECTORATE OF HIGHWAYS/IZMIR

information;

Km 52+450 - 79+350

Total Path Length : 26.900,00 m

hyperlinks;

Uzundere Bridge : Tek Açıklıklı 22,95 m uzunluğunda

Gelinboz Bridge İki Açıklıklı   32,90 m uzunluğunda

Paid DDY Bridge : Üç Açıklıklı   54,50 m uzunluğunda 

Ø120 Pile Construction : 3680,00 m

Ø100 Pile Construction : 3236,00 m

Road Excavation : 2.131.800,000 m3

Filling Execution : 1.240.570,000 m3

Concrete : 67.647,000 m3

PMAT+PMT : 948.400,000 ton

Bituminous Foundation191.820,000 ton

Binder : 170.112,000 ton

Wearing 80.064,000 ton