Category

REŞADIYE-GOLOVA DIVISION ROAD EARTH WORKS PROJECT

2x2 Lane State Road  (Earth Works, Engineering Works, Bridge Works( Koyulhisar ve Şebinkarahisar 2 Subway Bridges), Superstructure (Plentmiks Sub-base, Plentmiks Foundation, Bituminous Hot Foundation, Asphalt Concrete Binder Layer, Asphalt Concrete Wear Layer ) Work                                      

Reşadiye (7th Region Hd)- Gölova division road (Section I) (between Km:0+000-47+000) Earth works, engineering structures implementation construction and superstructure works (Bsk). Following the completion of missing earth works and engineering structures implementation construction of 47 km road, which was completed in advance as 2x2 at the level of surface treatment starting from Tokat province border of Gerede-Merzifon-Niksar-Refahiye-Erzincan- Erzurum - Ağrı - Doğubeyazıt road axis up to Suşehri (Sivas) entry, construction work for road's binder and wearing courses, bituminous base, which are bituminous hot mixture layers along with Plant Mix Base layer by removing the current surface treatment layers. As part of the tender there are two cut and cover tunnels (Each of these intersections, which will be built with bored pile wall system is approximately 350 meters in length and there are around 10.000 m Q 100 and 500 m Q 120 Bored piles in total of two intersections) and 17 at-grade intersections are available.

Agreement Date: 23.08.2011

  • ALL
  • PHOTOS
  • VIDEOS