INTERSECTION ARRANGEMENT BETWEEN AMASYA-TURHAL
ReorganIzatIon of the road constructIon work of junctIon reconstructIon, soIl works, tunnel, engIneerIng works,superstructure, bItumIous hot mIxture between Amasya-Turhal (Km:11+814-63+420)
2x2 Lane State Road . Earth works, Engineering works, Tunnel work ( Tunnel = 1010 m. Duplex Tube) , Superstructure (Plentmiks Sub-base, Plentmiks Foundation, Bituminous Hot Foundation, Asphalt Concrete Binder Layer, Asphalt Concrete Wear Layer ) Work
Employer : 7th REGIONAL DIRECTORATE OF HIGHWAYS
Date of the Contract : 09.12.2016