Category

INTERSECTION ARRANGEMENT BETWEEN AMASYA-TURHAL

ReorganIzatIon of the road constructIon work of junctIon reconstructIon, soIl works, tunnel, engIneerIng works,superstructure, bItumIous hot mIxture between Amasya-Turhal (Km:11+814-63+420)

2x2 Lane State Road . Earth works, Engineering works, Tunnel work (  Tunnel = 1010 m. Duplex Tube) , Superstructure (Plentmiks Sub-base, Plentmiks Foundation, Bituminous Hot Foundation, Asphalt Concrete Binder Layer, Asphalt Concrete Wear Layer ) Work

Employer : 7th REGIONAL DIRECTORATE OF HIGHWAYS

Date of the Contract :  09.12.2016