Scope of work : CONSTRUCTION OF ADDITIONAL LINE, INFRASTRUCTURE, SUPERSTRUCTURE, ART STRUCTURES, EXTENSION OF UNDERPASS, AND ELECTRIFICATION WORKS ON THE KONYARAY ROUTE
Number of station : 13 stations
Length : 18 km
Route : commences at Km:0+000, situated at Konya Train Station. The line ends at Km:18+000, at the Lojistik Merkez Station.
The project comprises two lines, namely Line 1 and Line 2, which will be constructed adjacent to the existing railway tracks on the left side.
The project commences at Km:0+000, situated at Konya Train Station. Progressing in a northerly direction, it intersects with Yeni Meram Avenue at Km:0+400. Within this context, the existing Meram Bridge will be subject to renovation as part of the project. Key stations along the route include the Municipality Station at Km:1+000, Rauf Denktas Station at Km:1+900, Kule Merkez Station at Km:3+100, Yeni Konya Gari Station at Km:4+250, and Mobilyacilar Station at Km:5+250. The line then reaches the Adana Road Bridge Interchange at Km:6+500.
Further along, the Sanayi-1 Station is located at Km:6+600, followed by the Sanayi-2 Station at Km:8+300, the Cimento Station at Km:9+750, the Aksaray Station at Km:11+600, the Jet Ussu Station at Km:13+700, and the Airport Station at Km:16+050. Finally, the project concludes at Km:18+000, at the Lojistik Merkez Station.
The total length of the dual-track railway project amounts to 18,000 meters.
Contract date : 27.04.2023