KOCAELI - GÖLCÜK ROAD CONSTRUCTION WORKS.
ONSTRUCTION OF CONNECTION ROADS (GROUP 3) FOR PERMANENT SETLEMENT AREAS AT KOCAELİ-GÖLCÜK EARTHQUAKE-AFFECTED REGIONS, TURKEY
Brief description of the works performed by the applicant : Construction of the İzmit-Yalova state road portion Km 5+278-19+500 and 21+50024+900 as (2X2) lane divided road. 5 bridge crossing Gölcük 1 connection road portion Km 0+000-1+573 (2X2 lane) Earth works : 3.063.104,000 m3
Rock Filling : 381.595,000 m3
Granular Filling : 744.578,000 m3
Plantmixs Foundation : 894.636,000 ton
Bituminous Foundation : 188.010,000 ton
Binder Course : 180.705,000 ton
Wearing Course : 1.958,000 ton
Pretension Crossbeam Bridges : 10 pcs. 9409 m2)
Pedestrian Cross Bridges : 6 Pieces
Bored Pile : 15.685,00 m
Jet Grouting : 89.545,00 m
Aggrement Date: 10.04.2001