AKŞEHIR - AFYON ROAD CONSTRUCTION WORKS.
Akşehir - Afyon Road Km: 123+700 - 125+562 G (129+000 İ) - 131+500 (Akşehir City Gate) and Km: between 157+000 - 221+000 Earth Works, engineering structures and bituminous hot mixture etc. road construction work.
Brief description of the works performed by the applicant : The route is between Akşehir-Afyon km:157+000-221+000 (Afyonkarahisar-Sultandağı), Total 64 km and 4,362 km Akşehir city passage.
Within the tender works
Excavation : 40000 m3,
Backfilling : 200000 m3,
Pmat : 50000 ton,
B. Foundation : 1675000 m2,
Binder : 1600000 m2,
Wearing : 1600000 m2
Aggrement Date : 16.11.2011